Published: Građevinar 59 (2007) 8
Paper type: Professional paper
Download article (Croatian): PDF
Download article (English): n/a
Pile testing at the Dubrovnik passenger port construction site
Abstract
The pile testing was conducted for piles realized in the rock mass in the Port of Gruž. It is emphasized that these tests are realized quite seldom, principally due to the high cost of such testing. Geological and geotechnical survey results are presented A survey of preliminary tests, with all factors relevant for estimating quality of realized piles, is presented. Results of this pile testing operation, which involved longitudinal and transverse loading of test piles, are presented and analyzed.
KeywordsGruž port, principally due to the high cost of such testing. Geological and geotechnical survey results are presented A survey of preliminary tests, ZAGREB • BERISLAVIĆEVA 6 UDK 624+69(05)=862 • CODEN: GDVIAE • ISSN 0350-2465 • ZAGREB • VOLUMEN 63 broj 08 / kolovoz 2007 width= Ivo Barbalic, test piles, with all factors relevant for estimating quality of realized piles, Branimir Galjan, rock mass, is presented. Results of this pile testing operation, Matija Bandic, construction site, which involved longitudinal and transverse loading of test piles, Krešo Ivandic Pile testing at the Dubrovnik passenger port construction site UDK 624.155.001.42 (Professional paper, pile capacity , are presented and analyzed. Entire article - In Croatian language Key words: Dubrovnik passenger port, received on June1507) The pile testing was conducted for piles realized in the rock mass in the Port of Gruž. It is emphasized that these tests are realized quite seldom